{"id":579,"date":"2020-08-03T08:55:04","date_gmt":"2020-08-03T06:55:04","guid":{"rendered":"https:\/\/opennet.ge\/?p=579"},"modified":"2025-10-10T23:13:14","modified_gmt":"2025-10-10T21:13:14","slug":"the-construction-of-the-pilot-network-will-take-place-in-49-settlements-of-guria-region","status":"publish","type":"post","link":"https:\/\/opennet.ge\/en\/read\/579","title":{"rendered":"The construction of the pilot network will take place in 49 settlements of Guria region"},"content":{"rendered":"<p>The design and construction of the broadband infrastructure (including data transmission network\/equipment) in the target geographical area of Ozurgeti will be performed by Ltd. &#8220;Parvus Group&#8221;.\u00a0 An agreement between the company and &#8220;Open Net&#8221; has already been signed, according to which the completion of the project is planned by the end of this year.<\/p>\n<p>Taking into account the selection criteria of the program pilot area and number of settlements and population in the targeted geographic area of white zone, the project will be implemented in the teritory of\u00a0Ozurgeti Municipality of Guria region, main parameters of which are: number of settlements &#8211; 49, households &#8211; 8 516, population 28 567 inhabitants, approximate length of the fiber optic cable &#8211; 145 kilometres.<\/p>\n<p><strong>Pilot Region Construction Area:\u00a0<\/strong><\/p>\n<p>Askana, Akhalsofeli, Baileti, Baghdadi, Bogili, Gantiadi, Gaghma Dvazbu, Gomi, Kvemo Etseri, Dvabzu, Vake, Vakijvari, Vaniskedi, Zemo Bakhvi, Zemo Uchkhubi,\u00a0Zemo\u00a0Dzimiti,\u00a0Zemo\u00a0Makvaneti, Tkhinvali, Ianeti, Kvachaleti, Konchkati, Likhauri, Meria, Mziani, Mtispiri, Mocvnari, Mshvidobauri, Nagomari, Naghobilevi, Niabuauri, Ormeti, Oqroskedi, Silauri, Famfaleti, Kvemo Bakhvi,\u00a0Kvemo Dzimiti,\u00a0Kvemo\u00a0Makvaneti, Shua Isnari, Cikhisferdi, Ckhemliskhidi, Tsitelmta, Chala, Chianeti, Chanieturi, Khvarbeti, Khrialeti, Jumati, Daba Naruja and Atchi.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The design and construction of the broadband infrastructure (including data transmission network\/equipment) in the target geographical area of Ozurgeti will be performed by Ltd. &#8220;Parvus Group&#8221;.\u00a0 An agreement between the company and &#8220;Open Net&#8221; has already been signed, according to which the completion of the project is planned by the end of this year. Taking [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":581,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-579","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general_en-us"],"_links":{"self":[{"href":"https:\/\/opennet.ge\/en\/wp-json\/wp\/v2\/posts\/579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/opennet.ge\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/opennet.ge\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/opennet.ge\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/opennet.ge\/en\/wp-json\/wp\/v2\/comments?post=579"}],"version-history":[{"count":0,"href":"https:\/\/opennet.ge\/en\/wp-json\/wp\/v2\/posts\/579\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/opennet.ge\/en\/wp-json\/wp\/v2\/media\/581"}],"wp:attachment":[{"href":"https:\/\/opennet.ge\/en\/wp-json\/wp\/v2\/media?parent=579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/opennet.ge\/en\/wp-json\/wp\/v2\/categories?post=579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/opennet.ge\/en\/wp-json\/wp\/v2\/tags?post=579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}